Parts Included In Your Moving Kit

Original

3' Original Gondola Train Roller

  • 3′ Roller moves 3 ft Solid Base Gondola Shelving and End Caps
  • Non-marring, high impact glass-filled roller bearing wheels
  • Double raceway swivel
  • Heavy duty steel construction
  • Minimal lift of 1 1/4 inch for installation
  • Locks into shelving base for stability and safety

4' Original Gondola Train Roller

  • 4′ Roller moves 4 ft Solid Base Gondola Shelving and End Caps
  • Non-marring, high impact glass-filled roller bearing wheels
  • Double raceway swivel
  • Heavy duty steel construction
  • Minimal lift of 1 1/4 inch for installation
  • Locks into shelving base for stability and safety

Original Gondola Train Jack Handle

Jack handle to lift solid base gondola shelving units.

Safety Kit

Safety Kit Includes:

  • 1 – Canvas Bag
  • 2 – Wheel Turner Handles (Kickplate Remover)
  • 16 – Safety Caps & Pins
  • 1 – Pull Strap

Red Joe Box

Joe Box is designed to securely pack Original Gondola Train Shelf Moving System rollers and jack handles for shipping and storage.

Quantity of Rollers Required

Below is a table of the Quantity of Rollers required to move various lengths of solid base gondola shelving. This information is applicable to the Original Gondola TrainTM mover for Solid Base gondola shelving.

3' Rollers

Shelving Length
Roller Quantity
15'
6
21'
8
27'
10
33'
12
39'
14
45'
16
51'
18
57'
20
63'
22
69'
24
81'
28
93'
32

4' Rollers

Shelving Length
Roller Quantity
20'
6
28'
8
36'
10
44'
12
52'
14
60'
16
68'
18
76'
20
84'
22
92'
24
108'
28
124'
32

Gondola Load/Handle Pressure Chart

**When a gondola has unequal deck depths on each side, use the load limit on the deepest deck for both sides.

Gondola Load/Handle Pressure Chart

Deck Depth
Maximum Section Load**
Handle Pressure
13″
1400 (lbs. per side, per section)
200 (lbs. per handle)
16″
1000
200
19″
800
200
22″
700
175
25"
600
150
28"
500
125
31"
400
100

Customer Testimonials

This was first time I used [Gondola Train]. They made a world of difference. Very nice to work with.

Jeff – ECI Construction

The Gondola Train was an invaluable tool and cut our move time easily in half! We are a multi branch operation and I have told our corporate office that if any other branch needs to rearrange, that they should definitely use your services. Thank you for all your help.

Dean Passaro, Branch Manager – Security Plbg & Htg Supply

I think what your company does is very cool and the cost is right in line. Thank you.

David Horn – Core Installations

We had an opportunity to use another type of gondola mover during another remodel. Although it did the job, it was cumbersome to handle and very time consuming to set up and take down. This is not the case with the Gondola Train. Because of the ease of setup of Walsh’s Gondola Train™, we have saved many man hours!

Bill Marik – Ace Hardware Round Lake Home Center

The Gondola Train™ enabled us to make the move in less than 1/4 the time. Also, we were able to make sales during the move.

Lee Nelson – Bluestem Farm & Ranch Supply

We had to put down a new flooring system in a 50+ year old building. We decided to use the Gondola Train. We were very concerned about the amount of labor that was going to be needed to reset all the product in a short time span. With the Gondola Train, very little resetting was needed. With a little prep time, it was a great experience. We reset 1200sqft of flooring and all product back in place in 2-1/2 days (flooring done at night). Thank you Gondola Train!

William Swartz III, VP/Store Manager – Robinson Hardware